Build Directory - Maintenance Guide for Claude
Purpose
This directory documents the actual construction process, including build progress, construction videos, utility installations, and milestone completion. These files serve as the historical record of how the garage was built.
Critical Workflow: Document Construction Progress
IMPORTANT: When documenting construction activities or milestones in this directory, you must also update the Timeline file with corresponding timeline entries.
When to Update Timeline
- Construction milestones completed (foundation pour, framing start, roof completion)
- Inspections passed or failed (with results and next steps)
- Material deliveries (major materials arriving on site)
- Utility installations (electrical, gas, water service)
- Weather events affecting construction (delays, damage, challenges overcome)
- Contractor coordination (subcontractor work, scheduling changes)
What to Update in Timeline
Add date-stamped entries to [[10-Planning/Timeline]]:
- YYYY-MM-DD: [Milestone description]; [additional details]; [link to build doc]. **Weather:** [conditions if relevant].Always include weather data for construction activities using the weather-mcp MCP tool.
Build Document Structure
Frontmatter Format
---
title: [Build Activity/Area]
type: build
tags: [garage, build, category, subcategory]
status: [planning|in-progress|completed]
---Status Values
planning- Preparing for this build phase, not yet startedin-progress- Currently under constructioncompleted- Build activity finished and documented
Common Document Types
1. Progress Documents
Initial Build.md- Foundation and early constructionFraming.md- Framing progress and detailsMechanical Room.md- Mechanical installations
2. System Documentation
Utilities & Conduits.md- Underground utilities and conduit routingDriveway.md- Driveway and site work
3. Media Documentation
Construction Videos.md- Time-lapse and video documentation
Weather Data Integration (CRITICAL)
Every construction activity must include weather data. Weather conditions affect:
- Concrete curing
- Material installation quality
- Work schedule decisions
- Future reference for troubleshooting
Using the Weather MCP Tool
For past construction dates:
Use: mcp__weather__get_historical_weather
Location: Detroit, Michigan (42.3314°N, -83.0458°W) or saved location
Date: YYYY-MM-DD of construction activity
For current conditions:
Use: mcp__weather__get_current_conditions
Location: Detroit, Michigan (42.3314°N, -83.0458°W) or saved location
Weather Format in Build Docs
**Weather:** [Conditions], [Temperature range]. [Context about how weather affected work].Examples:
**Weather:** Clear skies, 45-59°F. Ideal conditions for excavation and site prep work.**Weather:** Light drizzle during pour (9:24 AM-11:45 AM), overcast, 45-50°F. Challenging conditions but pour completed successfully.**Weather:** Heavy rain, 38-42°F. Outdoor work postponed; focused on material staging inside.**Weather:** Cloudy, 39°F. Good conditions for material delivery.
Construction Videos Documentation
Video Entry Format
When adding videos to Construction Videos.md:
### YYYY-MM-DD — [Activity Title]
[Description of what was accomplished]
**Weather:** [Conditions], [Temp range]. [Context about work conditions].
**YouTube Link:** [https://www.youtube.com/embed/VIDEO_ID]
<iframe width="560" height="315" src="https://www.youtube.com/embed/VIDEO_ID" title="[Title] - [Date]" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" allowfullscreen></iframe>
**Progress shown:**
- Bullet point 1
- Bullet point 2
- Key milestone
**Related documentation:**
- [[50-Build/Related Build Doc]]
- [[10-Planning/Timeline]]
- [[pictures/related-photo]]Critical Elements
- Weather data - Always include for context
- Date - YYYY-MM-DD format
- Description - What work was performed
- Progress shown - Bullet list of visible milestones
- Related documentation - Cross-references to build docs, timeline, pictures
Progress Documentation Pattern
Documenting Major Milestones
When a major construction milestone is reached:
Step 1: Document in Build File
Create or update relevant build document (e.g., Initial Build.md, Framing.md):
## [Milestone Name] - YYYY-MM-DD
**Weather:** [Conditions from weather MCP tool]
**Work Completed:**
- Detail 1
- Detail 2
- Detail 3
**Contractor:** [Company/Person]
**Quality Checks:**
- Check 1: [Pass/Fail/Notes]
- Check 2: [Pass/Fail/Notes]
**Issues Encountered:**
- Issue 1 and how it was resolved
- Issue 2 and resolution
**Photos:**
- [[pictures/photo-reference-1]]
- [[pictures/photo-reference-2]]
**Next Steps:**
- What happens next
- Dependencies
- Scheduled date for next phaseStep 2: Update Timeline
Add entry to [[10-Planning/Timeline]]:
- YYYY-MM-DD: [Milestone]: [brief description]; [key details]; [contractor name] (see [[50-Build/Document Name]]). **Weather:** [conditions].Step 3: Update Related Documents
- If inspection required → Create meeting note in
[[40-Meetings/]] - If materials used → Update order file in
[[30-Vendors & Contacts/Orders/]] - If design implemented → Update design doc status in
[[20-Design/]]
Utility & System Installation Documentation
Format for Utility Installations
## [Utility Name] Installation
**Installed:** YYYY-MM-DD
**Contractor:** [Company Name]
**Permit:** [Permit number]
**Inspection:** [Pass/Fail, Date, Inspector]
**Weather:** [Conditions during installation]
**Specifications:**
- Spec 1: Value
- Spec 2: Value
- Size/Capacity: [details]
**Routing/Location:**
- Entry point: [location]
- Path: [description or diagram]
- Termination: [location]
**Installation Details:**
- Step 1 performed
- Step 2 performed
- Special techniques used
**Cost:**
- Materials: $X,XXX
- Labor: $X,XXX
- Permit: $XXX
- Total: $X,XXX
**Documentation:**
- [[pictures/installation-photo-1]]
- [[Email Imports/permit-approval]]
- [[30-Vendors & Contacts/Orders/Related Order]]
**Notes:**
- Special considerations
- Deviations from plan
- Future maintenance accessQuality Assurance Documentation
Documenting Inspections
For passed inspections:
## [Inspection Type] - YYYY-MM-DD ✅ PASSED
**Inspector:** [Name, Department, Phone]
**Items Inspected:**
- Item 1
- Item 2
- Item 3
**Results:** All items approved with no deficiencies
**Weather:** [Conditions during inspection]
**Next Steps:**
- Proceed with [next phase]
- Schedule [next inspection type]
**Documentation:**
- [[40-Meetings/YYYY-MM-DD - Inspection - Type]]
- [[pictures/inspection-photo]]For failed inspections:
## [Inspection Type] - YYYY-MM-DD ❌ FAILED
**Inspector:** [Name, Department, Phone]
**Deficiencies Found:**
1. Issue 1 - [description]
- **Correction Required:** [what needs to be fixed]
- **Corrected:** YYYY-MM-DD by [contractor]
2. Issue 2 - [description]
- **Correction Required:** [what needs to be fixed]
- **Corrected:** YYYY-MM-DD by [contractor]
**Re-Inspection Scheduled:** YYYY-MM-DD
**Weather:** [Conditions during inspection]
**Documentation:**
- [[40-Meetings/YYYY-MM-DD - Inspection - Type]]Contractor Coordination Documentation
Recording Contractor Work
## [Work Type] by [Contractor Name]
**Date:** YYYY-MM-DD to YYYY-MM-DD
**Contractor:** [Company Name]
**Crew Size:** [number of workers]
**Weather:** [Conditions during work period]
**Scope of Work:**
- Task 1
- Task 2
- Task 3
**Materials Provided By:**
- Owner: [list materials]
- Contractor: [list materials]
**Work Quality:**
- Workmanship: [Excellent/Good/Acceptable/Poor]
- Timeliness: [On schedule/Delayed/Ahead of schedule]
- Communication: [Excellent/Good/Acceptable/Poor]
- Cleanup: [Excellent/Good/Acceptable/Poor]
**Issues/Deviations:**
- Issue 1 and resolution
- Change 1 and reason
**Cost:**
- Quoted: $X,XXX
- Actual: $X,XXX
- Difference: $XXX (reason for change)
**Would Use Again:** Yes/No (reason)
**Related:**
- [[30-Vendors & Contacts/Contractors/Company Name]]
- [[10-Planning/Timeline]]Picture Integration
Linking Pictures in Build Docs
Always link to picture documentation:
**Visual Documentation:**
- [[pictures/PXL_YYYYMMDD_HHMMSS]] - Foundation forms complete
- [[pictures/PXL_YYYYMMDD_HHMMSS]] - Concrete pour in progress
- [[pictures/DJI_0001]] - Aerial view of completed slabPicture Reference Best Practices
- Link pictures chronologically where possible
- Group pictures by topic/milestone
- Add brief description after link
- Reference pictures from specific angles when describing complex installations
Construction Phase Organization
Build documents often correspond to construction phases:
Phase 1: Foundation & Site Work
Initial Build.md- Excavation, forms, foundationDriveway.md- Site grading and drivewayUtilities & Conduits.md- Underground utilities
Phase 2: Slab & Radiant
Initial Build.md- Continue with insulation, PEX, pour
Phase 3: Framing
Framing.md- Wall framing, roof trusses, sheathing
Phase 4: Envelope
- TBD - Roof, siding, windows, doors
Phase 5: Mechanical/Electrical
Mechanical Room.md- Boiler, radiant manifold, controls- TBD - Electrical service, panel, rough-in
Phase 6: Insulation & Drywall
- TBD - Insulation installation, drywall
Phase 7: Finish
- TBD - Paint, flooring, trim, cabinets
Create new build documents as phases progress and more detail is needed.
Quick Checklist for Build Documentation
When creating or updating a build document:
- Frontmatter includes: title, type: build, tags, status
- Date of construction activity clearly stated (YYYY-MM-DD)
- Weather data included (use MCP weather tool for construction dates)
- Contractor name and company documented
- Work completed described in detail
- Quality checks and inspection results recorded
- Issues encountered and resolutions documented
- Pictures linked with brief descriptions
- Cost information included (if applicable)
- Cross-references to related documents added
- CRITICAL: Timeline updated with milestone
- If inspection: Meeting note created in 40-Meetings
- If materials used: Order file updated in Orders
- If video captured: Added to
Construction Videos.md
Example: Complete Build Documentation Workflow
Scenario: Concrete foundation pour completed on 2025-10-30
Step 1: Update Initial Build.md
## Foundation Pour - 2025-10-30
**Weather:** Light drizzle during pour (9:24 AM-11:45 AM), overcast 100% cloud cover, 45-50°F. Challenging conditions but pour completed successfully; cleared by evening.
**Contractor:** [Cement contractor name]
**Start Time:** 9:24 AM EDT
**Completion:** End of day (finishing work)
**Work Completed:**
- Concrete truck arrived 9:24 AM
- All utility conduits installed through slab (gas, water, electrical, low-voltage, sewer)
- Concrete poured and leveled across entire 24'×40' foundation
- Finishing work completed
- Embedded systems integrated: radiant PEX, fiberglass rebar, utility conduits, thickened lift pads
**Visual Documentation:**
- Approximately 1 hour of video captured from upstairs window
- See [[50-Build/Construction Videos]]
**Major Milestone:** Foundation complete with all embedded systems successfully integrated
**Next Steps:**
- Post-pour finishing and control joints (2025-10-31)
- 28-day cure period before framingStep 2: Add Video to Construction Videos.md
### 2025-10-30 — Concrete Foundation Pour
Major milestone: Foundation pour with all embedded systems.
**Weather:** Light drizzle during pour (9:24 AM-11:45 AM), overcast 100% cloud cover, 45-50°F—challenging conditions but pour completed successfully; cleared by evening.
[Video embed and details]Step 3: Update Timeline
Add to [[10-Planning/Timeline]]:
- 2025-10-30: Concrete foundation pour completed; cement truck arrived at 9:24 AM EDT; all utility conduits installed through slab (gas, water, electrical service, low-voltage/data, sewer); concrete poured and leveled across entire 24'×40' foundation; finishing work in progress (expected completion end of day); approximately 1 hour of real-time video documentation captured from upstairs window (see [[50-Build/Construction Videos]]); major construction milestone achieved with all embedded systems successfully integrated (radiant heating PEX, fiberglass rebar, utility conduits, thickened lift pads). **Weather:** Light drizzle during pour (9:24 AM-11:45 AM), overcast 100% cloud cover, 45-50°F—challenging conditions but pour completed successfully; cleared by evening.Related Documents
- Timeline - Project timeline (UPDATE THIS with every construction milestone!)
- 40-Meetings - Meeting notes and inspections
- Contractors - Contractor information and performance tracking
- 20-Design - Design documents being implemented
- pictures - Photo documentation
This file is automatically ignored in Quartz builds but tracked in git for AI assistant reference.