Site Preparation - Early Excavation Stage

Photo Details
- Date: October 20, 2025
- Time: 12:56 PM
- Weather: Clear skies, 54°F. Excellent visibility for photography.
- Phase: Site excavation and preparation
- Location: 309 E. 7th St., Clare, MI
Description
This image shows the early stage of the garage construction site preparation. The backyard area has been cleared and excavation work has begun.
Visible Elements
- Excavation Equipment: Orange excavator/backhoe visible in the background near the existing house
- Site Condition: Cleared lawn area with some disturbed soil and dirt patches
- Existing Structures: White house with lattice fence visible in background
- Seasonal Context: Fall season evident from colorful autumn foliage (orange, yellow, and green trees)
- Lumber: Stack of dimensional lumber visible on the left side of the frame
- Drainage: Black corrugated drainage pipe visible in foreground
Construction Context
This represents the beginning phase of the garage construction project, where the site is being prepared for foundation work. The excavation equipment is positioned to begin digging for the concrete rat wall and slab foundation specified in the Hershberger’s Contract.