Insulation Panels Delivered - Cratherm Foam Material

Cratherm Insulation Panels

Photo Details

  • Date: October 21, 2025
  • Time: 1:24 PM (next day after foundation prep)
  • Weather: Brief clear period during delivery, 60°F. Rain and storms throughout day caused installation pause.
  • Phase: Material delivery and staging
  • Location: 309 E. 7th St., Clare, MI
  • View: Backyard showing stacked insulation materials

Description

This midday photo, taken the day after the foundation forms were completed, shows a large delivery of orange and white rigid foam insulation panels stacked in the backyard, along with additional construction materials.

Visible Elements

  • Insulation Panels: Large stack of rigid foam insulation
    • Orange panels with white stripes - Likely Creatherm brand
    • Multiple panels stacked (appears to be significant quantity)
    • Positioned on the lawn near the construction area
  • Additional Materials:
    • White rigid foam boards/panels stacked on left side
    • Black bucket or container in foreground
    • White panel or board leaning against the stack
  • Soil Piles: Dark soil mounds from excavation work visible in background
  • Site Context:
    • Existing white house with lattice fence in background
    • Natural wood fence on right side
    • Fall trees with vibrant orange and yellow foliage
    • Clear sunny day with blue sky

Material Identification

Based on the Delivery invoice for hydronic heating and contract specifications, this delivery likely includes:

  • 110 sheets of 9x4 Creatherm (orange/white panels visible)
  • Additional foam materials for:
    • 2” Creatherm foam under concrete for in-floor heat insulation
    • Perimeter frost protection panels
    • Possibly additional wall insulation materials

Construction Timeline

This photo represents the next day’s work after foundation forming:

  • Day 1 (Oct 20): Foundation excavation, forming, perimeter foam installation
  • Day 2 (Oct 21): Insulation materials delivered for under-slab installation

The timing suggests the next construction steps will be:

  1. Install 2” Creatherm foam under the entire slab area
  2. Install PEX tubing for in-floor heating on top of foam
  3. Install utility sleeves
  4. Pour concrete slab and rat wall