Inspecting Dormer from Exterior

Person looking up at child in dormer opening, exterior view

Photo Details

  • Date: December 9, 2025
  • Time: 3:13 PM EST
  • Weather: Cloudy, 33°F (feels like 25°F). Overcast skies with snow cover on roof and ground.
  • Phase: Framing – dormer sheathing and roof underlayment
  • View: Front elevation from driveway facing north

Description

Exterior view of the garage showing Tyvek-wrapped dormer openings and roof underlayment partially snow-covered. A helper leans from the right dormer while another person observes from the driveway near the skid steer. Lower level remains open with framed garage bays and stacked materials inside.

Visible Elements

  • Two front dormers sheathed with Tyvek flashing at window openings
  • Synthetic underlayment on main roof with snow cover at eaves
  • Open garage bays with exposed framing
  • Gehl skid steer parked at the right foreground

Notes

  • Confirms dormer flashing wrap and roof protection after snowfall.
  • Good reference for exterior progress before window installation and siding.