Framing Progress – View from House Window

Photo Details
- Date: December 3, 2025
- Time: 1:13 PM EST
- Weather: Overcast, 20-24°F. Snow on site; cold but workable conditions for framing.
- Phase: Framing – wall layout and bracing
- View: Elevated east-to-west view from house window toward garage slab
Description
Midday snapshot showing active wall framing with headers, studs, and diagonal bracing in place. Material stacks are staged for quick access, and the slab is clear for continued work.
Visible Elements
- Three garage door openings framed with LVL headers and cripple studs
- Temporary bracing across openings and corners to hold plumb during construction
- Lumber bundle stacks along the left edge and green palletized material in the middle
- Work tables on sawhorses set up at right for cutting and assembly
- Snow-covered red classic car in the foreground indicating ongoing winter conditions
Notes
- Good reference for wall spacing, bracing layout, and header installation sequence.
- Confirms ample staging space maintained on slab despite snow cover.