Materials Staged Inside Garage

Interior view with stacked windows, stone panels, and trim

Photo Details

  • Date: December 11, 2025
  • Time: 4:53 PM EST
  • Phase: Roofing/Exterior shell – material staging
  • View: Inside garage looking toward stair framing

Description

Interior staging area shows stacked standard windows, the large egress window, packaged stone panels, exterior door, trim bundles, and misc. hardware laid out on the slab. Stair framing to the loft is visible at the back wall.

Notes

  • Confirms delivery of windows, door, stone panels, and trim awaiting installation.
  • Useful inventory snapshot before materials are moved for install.