North Wall Corner and Soffit Detail

North Wall Corner Detail

Photo Details

  • Date: January 1, 2026
  • Time: 3:00 PM EST
  • Weather: Cloudy, 21°F (feels like 11°F with wind chill). Snow cover on ground.
  • Phase: Siding Installation
  • Location: 309 E. 7th St., Clare, MI
  • View: Looking up at northeast corner from ground level

Description

Upward view showing the northeast corner where the north wall meets the front dormer area. This angle highlights the completed soffit installation, corner trim integration, and transition between main wall siding and upper dormer structure.

Visible Elements

Soffit & Fascia:

  • White vented soffit panels with perforations for attic ventilation
  • Continuous soffit running along roof overhang
  • White fascia board at roof edge
  • Clean corner transition at building corner

Siding Details:

  • Light gray vinyl siding with horizontal courses
  • White two-piece corner post trim
  • Siding properly terminated at soffit
  • Window visible on north wall below

Upper Structure:

  • Dormer area visible above main roofline
  • Metal roof edge along main roof plane
  • Gable section of dormer in view

Environment:

  • Bare tree branches in background
  • Overcast winter sky
  • Neighbor’s structures partially visible

Construction Quality Notes

  • Soffit vents properly distributed for attic ventilation
  • Corner trim aligned vertically
  • Siding courses level and consistent
  • Proper clearance maintained at soffit interface