North Wall Siding with Windows

Photo Details
- Date: January 1, 2026
- Time: 3:00 PM EST
- Weather: Cloudy, 21°F (feels like 11°F with wind chill). Snow cover on ground.
- Phase: Siding Installation
- Location: 309 E. 7th St., Clare, MI
- View: North wall from neighbor’s yard, looking south
Description
North wall showing vinyl siding complete with both main-floor windows installed and trimmed. The siding installation on this elevation is finished, showing the final exterior appearance with white vinyl window frames and white corner trim.
Visible Elements
Completed Siding:
- Light gray vinyl siding installed full height
- Horizontal courses running length of wall
- White corner trim at northwest corner
- Clean J-channel around windows
Windows:
- Two 35½” x 35½” double-hung windows
- White vinyl frames with screens installed
- Factory white trim integrated with siding
- Windows provide natural light to main garage floor
Roofing Integration:
- White soffit panels along roof overhang
- Charcoal metal roof edge visible
- Proper siding-to-soffit transition
Environment:
- Snow-covered narrow walkway along building
- Black chain-link fence along property line (right)
- Neighbor’s house visible in background (blue/gray siding)
- Winter conditions with bare trees
Construction Status
North wall siding 100% complete. Windows properly trimmed and integrated with siding system.