West Wall Siding Complete

Photo Details
- Date: January 1, 2026
- Time: 3:00 PM EST
- Weather: Cloudy, 21°F (feels like 11°F with wind chill). Snow cover on ground.
- Phase: Siding Installation
- Location: 309 E. 7th St., Clare, MI
- View: West (rear) wall from backyard looking east
Description
West (rear) wall showing vinyl siding fully installed from foundation to roofline. This wall section is complete with clean horizontal siding courses, window trim, and soffit/fascia. Two small exhaust vents visible for future mechanical ventilation.
Visible Elements
Completed Siding:
- Light gray vinyl siding installed full height
- Clean horizontal courses with consistent alignment
- White corner trim at building corners
- White soffit panels under roof overhang
- White fascia along roof edge
Windows:
- Two small rectangular windows (likely bathroom/utility vents or fixed windows)
- White vinyl window frames with trim
- Windows appear to be awning or fixed style
Roofing:
- Charcoal standing-seam metal roof visible at edge
- Roof overhang with vented soffit
Environment:
- Snow-covered ground along building
- White lattice fence/screen along property line (right side)
- Neighbor’s structures visible in background
- Bare deciduous trees
Construction Status
West wall siding 100% complete. This is the first full wall elevation finished, demonstrating the final appearance for the building exterior.