Front Dormer Detail - Siding Complete

Photo Details
- Date: January 2, 2026
- Time: 5:28 PM EST
- Weather: Clear skies, 18°F (feels like 8°F with wind chill). Snow visible on roof.
- Phase: Siding Installation
- Location: 309 E. 7th St., Clare, MI
- View: Looking up at front (east) dormer from ground level
Description
Upward view of front dormer showing completed vinyl siding installation. The dormer features beige/cream vinyl siding with a double-hung window. The charcoal standing-seam metal roof panels are visible with light snow accumulation. Below the dormer, the front wall still shows exposed Tyvek HomeWrap where siding installation is on hold due to missing stone panel.
Visible Elements
Completed Work - Dormer:
- Vinyl siding fully installed on dormer face and returns
- Double-hung window with white frame/trim
- Metal roof panels integrated with dormer
- Soffit and J-channel trim complete
- Ridge flashing at dormer roof peak
Roof Details:
- Charcoal standing-seam metal panels
- Snow accumulation visible on panels
- Clean seams running from eave to ridge
- Note: Snow guards still need to be installed
Work On Hold (Below Dormer):
- Tyvek HomeWrap branding clearly visible
- “MADE IN THE USA” text on house wrap
- Front wall siding cannot proceed until stone panel arrives
Construction Context:
- Bare trees indicate winter season
- Clear blue sky visible
- Good visibility of completed dormer work quality