Garage Door Installation in Progress - Interior View

Photo Details
- Date: January 21, 2026
- Time: 9:46 AM EST
- Weather: Cloudy, 30°F
- Phase: Garage Door Installation
- Location: 309 E. 7th St., Clare, MI
- View: Interior, looking toward garage door openings from rear of garage
Description
Interior view during active garage door installation. Two of the three garage doors have been installed with tracks and hardware in place. The installer’s ladders are positioned near the center bay for ongoing work.
Visible Elements
Installed Components:
- Two garage doors installed with track systems
- Curved track rails mounted to ceiling joists
- Door panels with horizontal ribbed design
- Window panels visible at top of doors
Work in Progress:
- Two aluminum ladders staged for installation work
- Installation materials and tools on floor
- Cardboard protection under work areas
- Scrap lumber and packaging materials
Structure:
- Exposed ceiling joists and rafters
- OSB wall sheathing visible
- Loft stairway framing on left
- Stud wall framing throughout