Garage Door Installation in Progress - Alternate Interior View

Photo Details
- Date: January 21, 2026
- Time: 9:46 AM EST
- Weather: Cloudy, 30°F
- Phase: Garage Door Installation
- Location: 309 E. 7th St., Clare, MI
- View: Interior, similar angle showing installation work area
Description
Alternate interior view captured moments after the previous photo, showing the same installation scene from a slightly different perspective. Two garage doors are installed with the third bay still open. Installation equipment and materials visible throughout the work area.
Visible Elements
Door Installation:
- Two doors installed with curved track rails
- Track mounting hardware secured to ceiling joists
- Door panels with ribbed pattern and window sections
Installation Equipment:
- Aluminum step ladders positioned for work
- Tool bags and equipment on floor
- Protective cardboard beneath work areas
Garage Interior:
- Concrete slab floor visible
- Exposed framing and OSB sheathing
- Loft stair framing on left side
- Snow visible through open third bay