Third Garage Door Panels Staged for Installation

Photo Details
- Date: January 21, 2026
- Time: 9:49 AM EST
- Weather: Cloudy, 30°F
- Phase: Garage Door Installation
- Location: 309 E. 7th St., Clare, MI
- View: Interior, looking toward third bay opening with door panels staged
Description
The third garage door’s panel sections are staged inside the garage, awaiting installation. The door panels are stacked horizontally on the concrete floor near the open third bay. Snow is visible outside through the opening.
Visible Elements
Door Panels:
- Multiple stacked garage door panel sections
- Cardboard and protective packaging on panels
- Factory labels visible (appears to be manufacturer specifications)
- White/tan color matching the two installed doors
Staging Area:
- Panels positioned near third bay opening
- Cardboard sheet used as floor protection
- Snow and exterior visible through open bay
Garage Interior:
- Concrete slab floor
- OSB wall sheathing
- Exposed stud framing