North Wall Workbench-Height Outlets — Two Installed
![]()
Photo Details
- Date: June 8, 2026
- Time: 12:29 PM EDT
- Phase: Electrical rough-in / device install
- Location: 309 E. 7th St., Clare, MI — interior, north wall
- View: Along the north wall studs showing both perimeter outlet rows
Description
Progress on the north wall device install. Two of the planned workbench-height boxes now have 20A duplex receptacles wired in; the remaining boxes still need outlets — both the rest of the workbench-height row and the lower ~16” AFF floor-line row. Yellow 12-gauge NM-B daisy-chains the boxes along the studs.
Continues the north-wall work documented on May 26 (both outlet lines + workbench GFCI) — the two-row layout (16” AFF floor outlets + workbench-height) per Electrical Planning.
Visible Elements
- Two installed duplex receptacles at workbench height (center stud bay and far right)
- Empty boxes awaiting devices — remaining workbench-height positions + the lower 16” AFF floor row
- Wiring: yellow 12-ga NM-B run horizontally between boxes (Wago/pigtail splices inside)
- Blue PVC new-work boxes mounted on the framing
- OSB sheathing with orientation stamp (“INSIDE / DOWN … ABAJO”)
- Floor: two portable rechargeable LED puck work lights (glowing blue) powering the session’s task lighting
Related Documents
- Electrical Planning — outlet layout & heights
- Timeline
- Initial Build