Foundation Insulation - Aerial Drone View

Foundation Insulation Aerial

Photo Details

  • Date: October 25, 2025
  • Weather: Clear morning transitioning to overcast afternoon, 39-53°F. Excellent conditions for aerial photography and documentation.
  • Phase: Foundation - Under-slab insulation complete
  • Location: 309 E. 7th St., Clare, MI
  • View: Direct overhead aerial view from drone
  • Equipment: DJI Phantom 4 Pro

Description

This overhead drone photo captures the completed Creatherm foam insulation installation from directly above, providing a clear view of the foundation layout and insulation pattern.

Visible Elements

  • Creatherm Insulation:
    • Bright orange foam panels with white stripe pattern
    • Complete coverage across the entire 24’ x 40’ foundation footprint
    • Two square openings for thickened concrete pads (future 2-post car lift foundation)
    • Systematic panel layout clearly visible from overhead
    • Blue PEX line visible - future slab temperature sensor conduit installed by owner (see Decisions - Slab Sensor Conduit)
    • PEX loops visible on left side in mechanical room area for future boiler connections
  • Foundation Forms:
    • Dark wooden perimeter forms defining the slab boundaries
    • Clean, straight edges showing the rectangular garage footprint
    • Additional foam insulation visible along perimeter edges
  • Surrounding Area:
    • Excavated and disturbed soil around the foundation perimeter
    • Fall foliage with vibrant orange and yellow trees in background
    • Natural lighting showing texture and detail of insulation surface

Construction Stage

This image documents the foundation ready for the next phase of construction:

  • ✓ PEX radiant heating installation (orange PEX loops)
  • ✓ Slab temperature sensor conduit (blue PEX line - owner installed)
  • Utility conduit placement
  • Rebar/wire mesh installation
  • Concrete slab pour