Exterior Slab Insulation and Fiberglass Rebar - Aerial View 6
Photo Details
- Date: October 29, 2025
- Weather: Clear skies, 45-55°F. Excellent conditions for outdoor prep work.
- Phase: Foundation - Exterior slab insulation and fiberglass rebar installation
- Location: 309 E. 7th St., Clare, MI
- View: Aerial drone view
- Equipment: DJI Phantom 4 Pro
Description
This aerial drone photo captures the exterior slab insulation and fiberglass rebar installation from yet another perspective, providing comprehensive documentation of the foundation preparation work.
Visible Elements
- Exterior Perimeter Insulation:
- Orange foam insulation panels surrounding foundation
- Provides thermal barrier between interior and exterior
- Extends outward from main foundation forms
- Critical for energy efficiency and frost protection
- Professional installation quality evident
- Fiberglass Rebar System:
- Complete grid pattern across entire foundation area
- Consistent spacing throughout 24’ x 40’ footprint
- Non-metallic reinforcement for concrete strength
- Properly positioned above base insulation and PEX
- Secured at intersections ready for pour
- Foundation Components:
- Orange Creatherm base insulation layer
- Wooden perimeter forms maintaining shape
- Two square openings for thickened concrete pads
- Radiant heating PEX loops visible in zones
- Blue PEX sensor conduit (owner-installed)
- Site Organization:
- Clean, well-organized work area
- Excavated perimeter for drainage
- Materials and equipment properly staged
- Ready for final inspection phase
Construction Stage
Foundation preparation documentation showing near-completion:
- ✓ Under-slab insulation complete (Creatherm)
- ✓ Radiant heating installation complete
- ✓ Utility conduits and sensors installed
- ✓ Exterior perimeter insulation installed
- ✓ Fiberglass rebar grid complete
- Pending: Building inspector approval, concrete scheduling