Concrete Foundation Pour Day - Cement Truck Arrival

Cement Truck Arrival

Photo Details

  • Date: October 30, 2025
  • Time: 9:24 AM EDT
  • Weather: Light drizzle, overcast, 46°F. Challenging conditions during pour.
  • Phase: Foundation - Concrete slab pour
  • Location: 309 E. 7th St., Clare, MI
  • View: Front porch perspective

Description

This photo captures the arrival of the concrete mixer truck on the day of the foundation pour, marking a major construction milestone for the garage project.

Visible Elements

  • Cement Mixer Truck:
    • Blue and gray industrial concrete mixer truck
    • Rotating drum visible from street
    • Positioned in front of the property ready to pour
    • Professional concrete delivery service
  • Site Context:
    • View from front porch of main house
    • White porch railing in foreground
    • Black outdoor lounge chair on porch
    • Residential neighborhood street visible
    • Fall foliage with orange and yellow trees
    • Clear autumn day with excellent working conditions
  • Staging:
    • Person visible in street (likely cement crew or contractor)
    • Truck positioned for optimal access to backyard pour location
    • Garbage container visible on left side of street

Construction Milestone

This marks the concrete foundation pour day - one of the most critical phases of the garage construction project. After weeks of preparation including:

  • Excavation and grading
  • Under-slab Creatherm insulation installation
  • Radiant heating PEX tubing layout
  • Fiberglass rebar grid placement
  • Exterior perimeter insulation
  • Utility conduit installation

The foundation is now ready for the concrete pour that will create the 24’ x 40’ garage slab.

Next Steps

Following the concrete pour:

  1. Concrete finishing and smoothing
  2. Curing period (typically 7-28 days for full strength)
  3. Form removal
  4. Backfilling around perimeter
  5. Beginning of vertical construction (walls and framing)