First Floor Walls Rising – Northwest View

Framing progress with first-floor walls and headers set

Photo Details

  • Date: December 3, 2025
  • Time: 1:12 PM EST
  • Weather: Overcast, 20-24°F. Snow-covered ground; good visibility for framing work despite cold.
  • Phase: Framing – first-floor walls and beam installation
  • View: Elevated northwest-to-southeast perspective from upstairs window

Description

Framing crew has stood the first-floor walls and installed major headers. The stair opening and loft framing are visible, along with temporary bracing and material stacks staged around the slab.

Visible Elements

  • Framed exterior walls around all four sides, including large garage door openings and window rough openings
  • Double LVL garage door header spanning the center bay with temporary bracing
  • Temporary diagonal bracing tying walls together for stability during framing
  • Bundles of lumber staged along the left side, with saw horses and cut station on the right
  • Snow-covered slab showing clear work area and debris pile centralized near the middle
  • Classic red car covered in snow parked in the foreground

Notes

  • Captures the first full-wall layout before roof trusses are installed.
  • Useful reference for stud layout, header placement, and bracing strategy on day one of framing.