Front Elevation Framing – Center Bay Braced

Photo Details
- Date: December 3, 2025
- Time: 3:30 PM EST
- Weather: Overcast, 18-22°F. Snow cover on site; cold conditions for framing progress documentation.
- Phase: Framing – wall erection day
- View: Ground-level front elevation looking north toward garage
Description
Front elevation of the framed garage showing triple door openings, LVL headers, and diagonal bracing across the center bay. A bundled-up child stands in front for scale, emphasizing opening heights and overall width.
Visible Elements
- Three garage door openings with LVL headers and cripple studs
- Diagonal bracing across center bay holding walls plumb
- Sheathing backer at base of walls protecting bottom plate and insulation area
- Snow-covered slab and surrounding yard
- Person in winter clothing providing height reference against framing
Notes
- Good reference for rough opening dimensions and header installation on day one of framing.
- Scale indicator helps future comparisons once sheathing and doors are installed.