Daylight Check on Roof Framing Progress

Elevated view of framed garage with loader parked in front

Photo Details

  • Date: December 4, 2025
  • Time: 2:53 PM EST
  • Weather: Passing clouds clearing to mostly clear, 12°F, NW winds 5-7 mph. Cold afternoon with long shadows on snow; temperatures dropping as sun lowers.
  • Phase: Framing – roof structure and bracing
  • View: Elevated perspective from house toward garage framing and driveway

Description

Afternoon overview showing the garage framed with roof trusses, dormer framing, and temporary bracing. Equipment is parked at the apron while material stacks flank the driveway.

Visible Elements

  • Roof truss grid with dormer walls partially framed at midspan
  • Loader staged at the apron with forks and green pallet attachment nearby
  • Lumber stacks and scrap pile organized along the right fence line
  • Snow-covered red classic car in foreground and cleared driveway tracks
  • Long shadows highlighting truss depth and bracing across the front wall

Notes

  • Useful for capturing overall framing completion status at mid-afternoon.
  • Related ground-level view later in the afternoon: PXL_20251204_195658005.