Dormer Walls Framed Above Garage Bays

Photo Details
- Date: December 4, 2025
- Time: 2:56 PM EST
- Weather: Mostly clear, 12°F, NW winds 5-7 mph. Cold afternoon with bright sun and snow cover; clearing trend continuing from morning overcast.
- Phase: Framing – dormer wall erection and roof truss tying
- View: Ground-level front elevation showing dormer framing progress
Description
Dormer wall panels are framed and stood atop the truss system, with bracing securing the openings. The loader remains on-site for material handling as roof framing continues.
Visible Elements
- Two dormer wall frames set on the roof structure
- Garage door openings with OSB wrap at lower posts and diagonal braces
- Loader centered at the apron for lifting duties
- Open roof framing and bracing visible through bays and gable ends
- Snow-packed work area with ladders and staging tables inside
Notes
- Captures dormer wall placement before roof sheathing.
- See earlier roof alignment detail at PXL_20251204_171356751.NIGHT.