Loft Stair Framing Walkthrough

Photo Details
- Date: December 9, 2025
- Time: 3:02 PM EST
- Weather: Cloudy, 33°F (feels like 25°F). Overcast skies with snow cover on ground; interior work protected by completed shell.
- Phase: Framing – interior stair and landing framing
- View: Inside stairwell looking north toward loft landing
Description
Stair framing to the loft is complete with treads temporarily decked for access. Vertical studs outline future guard walls and landing. A bundled-up helper stands on the mid-flight landing, showing scale of the framed opening and headroom beneath the upper stringer.
Visible Elements
- Straight-run stair with framed landing and blocking under stringer
- Open stud walls and OSB sheathing forming the stair enclosure
- Exposed LVL and truss framing overhead with metal connector plates
- OSB subfloor at landing and lower level
Notes
- Confirms stair rough-in dimensions and landing framing before drywall and guardrails.
- Useful reference for future handrail mounting locations and clearance checks.