Interior View - Loft Stairway

Photo Details
- Date: January 1, 2026
- Time: 3:01 PM EST
- Weather: Cloudy, 21°F. Interior shot protected from weather.
- Phase: Siding Installation (exterior) / Interior unfinished
- Location: 309 E. 7th St., Clare, MI
- View: Looking into main garage bay toward loft stairway
Description
Interior view showing the loft stairway and main floor construction staging area. The stairs to the loft are visible in the back left, with treads temporarily decked. Various construction materials and equipment are staged throughout the main floor space.
Visible Elements
Loft Access:
- Stairway to loft visible at rear left
- Temporary tread decking on stairs
- Stair opening in loft floor above
- Handrail not yet installed
Construction Staging:
- Yellow sawhorses in work area
- Yellow Dewalt miter saw stand (folded)
- Assorted lumber and trim pieces on floor
- Red gas cans (equipment fuel)
- Blue tarp covering stored items
- Cardboard boxes with supplies
Building Structure:
- OSB wall sheathing (interior side)
- Wall studs visible at framing stage
- Concrete slab floor
- Snow/ice tracked in from exterior
Equipment:
- Extension ladder stored against wall
- Various hand tools staged for work
Interior Status
Main floor remains unfinished with exposed framing. Priority is completing exterior siding before interior work begins. Loft framing complete with OSB subfloor installed.