Interior View - Work Area and Windows

Photo Details
- Date: January 1, 2026
- Time: 3:01 PM EST
- Weather: Cloudy, 21°F. Interior shot protected from weather.
- Phase: Siding Installation (exterior) / Interior unfinished
- Location: 309 E. 7th St., Clare, MI
- View: Looking into right bay toward north wall windows
Description
Interior view of the right garage bay showing the work staging area and installed windows on the north wall. Natural light enters through the two main-floor windows. Construction equipment and materials staged for ongoing siding work outside.
Visible Elements
Windows:
- Two 35½” x 35½” double-hung windows on north wall
- Natural light illuminating interior
- Windows installed with interior flanges visible
- View to neighbor’s property through windows
Construction Staging:
- Yellow Dewalt miter saw on stand
- Yellow sawhorses for work surface
- Orange extension ladder stored
- Cardboard box with levels and tools
- Siding trim pieces and lumber on floor
- Tyvek/building paper materials
Building Structure:
- OSB wall sheathing visible (interior face)
- 2x4 wall studs exposed
- Temporary diagonal bracing at walls
- Concrete slab floor with snow residue
Stair Area:
- Loft stair opening visible at left
- Stair stringers and landing framing
Interior Planning Notes
The main floor will eventually be finished with:
- Insulation in wall cavities
- Drywall or OSB interior sheathing
- Electrical outlets and lighting
- HVAC distribution from mechanical room