Completed Concrete Slab - Finished Surface

Completed Concrete Slab

Photo Details

  • Date: October 30, 2025
  • Time: 11:45 AM EDT
  • Weather: Light drizzle clearing, overcast, 49°F. Pour completed successfully.
  • Phase: Foundation - Concrete slab pour complete
  • Location: 309 E. 7th St., Clare, MI
  • View: Ground-level perspective from southwest corner

Description

This photo showcases the completed concrete foundation slab with professional finishing work, captured approximately 2 hours and 20 minutes after the pour began. The smooth, uniform surface demonstrates quality concrete placement and finishing.

Visible Elements

  • Finished Concrete Slab:
    • Smooth, professionally finished surface
    • Uniform gray concrete appearance
    • 24’ x 40’ (960 sq ft) garage footprint
    • Fresh concrete still in early curing stage
    • Level surface ready for construction
    • Some autumn leaves scattered on surface
  • Utility Conduits:
    • Orange PEX conduits visible protruding from slab
    • Gray PEX conduits also visible
    • Positioned for future electrical and utility connections
    • Multiple conduit runs emerging from slab
    • Strategic placement for workshop and garage services
    • Properly protected and positioned during pour
  • Perimeter Details:
    • Wooden forms still in place defining edges
    • Clean, straight edges along perimeter
    • Disturbed soil and excavated areas around foundation
    • Forms will remain during initial curing period
  • Site Context:
    • White lattice privacy fence on right side
    • Neighboring properties visible in background
    • Blue sky with clear afternoon light
    • Photographer’s shadow visible on left
    • Construction debris and excavated soil in foreground
    • Fall season with bare and colorful trees

Construction Quality

The finished slab shows professional concrete work:

  • Smooth troweled surface
  • No visible settling or cracking
  • Proper edge definition
  • Conduits properly positioned and protected
  • Level surface across entire area
  • Quality finishing techniques applied

Technical Achievement

This slab represents the successful integration of multiple systems:

  • ✓ In-floor radiant heating (PEX tubing embedded)
  • ✓ Fiberglass rebar reinforcement
  • ✓ Under-slab Creatherm insulation (2” thick)
  • ✓ Exterior perimeter insulation
  • ✓ Electrical conduits for future services
  • ✓ Thickened pads for 2-post car lift (integrated)
  • ✓ Proper substrate preparation and compaction

Next Steps

Following the pour:

  1. Curing period - Keep concrete moist for proper strength development
  2. Form removal (typically 24-48 hours)
  3. Continued curing (7-28 days for full strength)
  4. Backfilling around perimeter
  5. Wall construction and vertical framing can begin